PROPER AND RETRO COMMISSIONING

PROPER COMMISSIONING

For Greenship New Building

Proper Commissioning as required by GBCI is to identify energy use and condition of the mechanical system performance and utility buildings as well as by performing an adjustment and fine tuning the electrical system, mechanical, and power consumption that will result in optimal building performance. This process is outlined by the provisions of BEM 4 of the GBCI guidelines states as follows.

In short, the PC work can improve the whole building system performance and optimize energy saving such that the building will meet the green building certification requirements.

RETRO COMMISSIONING

For Greenship Existing Building

RC dilaksanakan untuk memastikan bahwa kinerja gedung dan utilitas yang berkaitan dengan konsumsi energi dan air sesuai dengan perencanaan. Lingkup pekerjaan retro-commissioning adalah sebagai berikut.

  • Cooling System Kapasitas yang dihasilkan (TR) pada kinerja VRV serta efisiensi VRV dalam COP dan KW/TR berdasarkan standar ARI‐550.
  • AHU Kapasitas pendingin (Btuh) pada kinerja AHU dan laju aliran udara (CFM) berdasarkan standar ARI‐430 untuk fan dan ARI‐410 untuk cooling coil‐nya.
  • Power Meliputi voltage drop, phase balance, infrared analysis yang hanya di panel utama
  • Sistem plambing Kinerja sistem daur ulang air sesuai dengan perencanaan. Kualitas di dalam Ruangan; mencakup:
    • Kenyamanan Termal Kondisi suhu udara di dalam ruangan 25oC ± 10C dan Kelembaban Relatif (RH) 60 ±10 %. Mengikuti SNI 03-6390-2000 (sesuai dengan GREENSHIP 1.1).
    • Sistem Pencahayaan Kuat penerangan di dalam ruangan harus memenuhi persyaratan seperti tersebut dalam S I 03‐6197‐2000 (sesuai dengan GREENSHIP 1.1).
    • Tingkat Kebisingan Tingkat kebisingan di dalam ruangan harus memenuhi persyaratan seperti tersebut dalam SNI 03‐6386‐2000 (sesuai dengan GREENSHIP 1.1).